Rain water treatment

Designation Operation concept Advantages

Equipment models

Model

Capacity, l/s

Weight, t

Dimensions, l/w/h, m

Пво-св-10

10

9.6

2-2.5х1.8х4.0

Пво-св-15

15

12.4

3-2.5х1.8х4.0

Пво-св-30

30

16.3

1-11.6х2.4х2.4

Пво-св-60

60

25.0

2-11.6х2.4х2.4

Пво-св-90

90

37.5

3-11.6х2.4х2.4

 

 

 

Designation of rain water treatment plants.

Water streams resulted from rain or snow melt wash off all available contaminants from terrain. These are most commonly oil product spills, sand and little rubbish. Development and manufacture of local units to treat rain waters is one of spc promvodochistka ltd business activities. Upon completion of purification procedure treated water may be discharged into drainage manifolds, open water reservoirs or topographic lows. Rain waters are treated under non-pressure mode (by gravity) at plants пво-св. Capacities of such plants vary from 10 l/s (пво-св 10) to 90 l/s (пво-св 90.

Operation concept of rain water treatment plants.

The treatment process is implemented in several stages:

  • Primary removal of oil products and suspended matters;
  • Thin-bed settling;
  • Coalescing on a floating filter medium layer;
  • Filtration through a sorption filter medium.

Plant пво-св design includes several sections:

  • Section 1 –an oil/dirt trap. Contaminated water flow enters a receiving tank. Large particles (sand, sludge, small stones) settle in a settling chamber (1.1). A majority of oil contaminants and solid particle residues are separated when passing through the settling chamber membranes (1.2). Separated oil products come to the top and are left on the surface.
  • Section 2 – a filter with floating filling medium. Pretreated water contains a fairly large number of oil products in the form of emulsion. While water flow passes through the filter medium a disperse system breaks down and oil containing contaminants are precipitated into a separate liquid phase.
  • Section 3 – a sorption filter. Its main function is a final advanced treatment in compliance with quality target values. Activated carbon or mineral sorbents (gaize, zeolites) may be utilized as the filter medium.
  • Section 4 – a clean water collector.
 
 
очистка ливневых сточных вод 
 
Treatment stages of plants пво-св.

Plant пво-св design includes several sections:

  • Section 1 –an oil/dirt trap. Contaminated water flow enters a receiving tank. Large particles (sand, sludge, small stones) settle in a settling chamber (1.1). A majority of oil contaminants and solid particle residues are separated when passing through the settling chamber membranes (1.2). Separated oil products come to the top and are left on the surface.
  • Section 2 – a filter with floating filling medium. Pretreated water contains a fairly large number of oil products in the form of emulsion. While water flow passes through the filter medium a disperse system breaks down and oil containing contaminants are precipitated into a separate liquid phase.
  • Section 3 – a sorption filter. Its main function is a final advanced treatment in compliance with quality target values. Activated carbon or mineral sorbents (gaize, zeolites) may be utilized as the filter medium.
  • Section 4 – a clean water collector.


очистка ливневых стоков

In the course of operation пво-св plants shall be periodically serviced:

  • Sediment formed in the settling chamber (section 1.1) is removed with the help of a sewage suction truck.
  • Water table in section 1.2 is cleaned by means of discharging flotation complexes into a sludge tank via a swing pipe. The sludge tank is cleaned mechanically to complete drying. Wastes contained in this section are pumped to a receiving storage facility
  • The floating medium (section 2) is cleaned by draining filter contents into section 1.2.
Cleaning of the sorption filter (section 3) and the cleaned water collector (section 4) is not provided for.

Advantages:

  • A modular design which makes addition of supplementary treatment stages possible;
  • Simple and easy installation. Time duration from delivery to reaching operation conditions is 2-3 days;
  • Degree of treatment in compliance with mpc (maximum permissible concentration) values which permit discharging into the terrain and open water reservoirs

Background.

Spc promvodochistka ltd does the whole scope of works relative to rain water treatment:

  • Collection and review of data required;
  • Process engineering and selection of equipment;
  • Delivery, installation, commissioning and startup of the system;
  • Service and after-guarantee maintenance.

Due to addition of supplementary treatment units the composition of a standard plant may vary depending on contaminants available. Upon the customer request, treated waters may be used to satisfy in-house demands which results in significant cost and resources saving of the enterprise.

 